ATS CB/Class 63A/100A/3p/4p Dual Power Automatic Transfer Switch Photovoltaic Solar Generator Changeover

Product Details
Customization: Available
Brand: Customized, Leidun
Operation: Electric/Handle
Diamond Member Since 2025

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Multi-language Pioneer
4 languages freely used by foreign trade staff. include: English, Spanish, Japanese, Russian
Raw-Materials Traceability
The supplier has traceability identification of raw materials
Full Customization
The supplier provides full customization services
to see all verified strength labels (22)
  • ATS CB/Class 63A/100A/3p/4p Dual Power Automatic Transfer Switch Photovoltaic Solar Generator Changeover
  • ATS CB/Class 63A/100A/3p/4p Dual Power Automatic Transfer Switch Photovoltaic Solar Generator Changeover
  • ATS CB/Class 63A/100A/3p/4p Dual Power Automatic Transfer Switch Photovoltaic Solar Generator Changeover
  • ATS CB/Class 63A/100A/3p/4p Dual Power Automatic Transfer Switch Photovoltaic Solar Generator Changeover
  • ATS CB/Class 63A/100A/3p/4p Dual Power Automatic Transfer Switch Photovoltaic Solar Generator Changeover
  • ATS CB/Class 63A/100A/3p/4p Dual Power Automatic Transfer Switch Photovoltaic Solar Generator Changeover
Find Similar Products

Basic Info.

Model NO.
LDQ9
Certification
CCC, CE, ISO9001
Type
Integrated automatic transfer switch
Poles
3p, 4p
Product Name
Automatic Transfer Switch
Model
Ldq9
Transport Package
Packing
Trademark
customizable
Origin
China

Product Description

ATS CB/Class 63A/100A/3p/4p Dual Power Automatic Transfer Switch Photovoltaic Solar Generator ChangeoverATS CB/Class 63A/100A/3p/4p Dual Power Automatic Transfer Switch Photovoltaic Solar Generator ChangeoverATS CB/Class 63A/100A/3p/4p Dual Power Automatic Transfer Switch Photovoltaic Solar Generator Changeover
ATS CB/Class 63A/100A/3p/4p Dual Power Automatic Transfer Switch Photovoltaic Solar Generator Changeover
 
End-type automatic transfer switches are applicable to end-type dual-circuit power supply systems with a frequency of 50Hz/60Hz, a rated operating voltage of 220V (2P), 380V (3P, 4P), and a rated current ranging from 6A to 630A. These switches can automatically transfer between the normal power supply and the standby power supply to ensure reliable power supply.
 
They are mainly used in high-rise buildings, shopping malls, and other places for equipment such as fire pumps, smoke exhaust fans, elevators, domestic water pumps, emergency lighting, and wayfinding signs.

ATS CB/Class 63A/100A/3p/4p Dual Power Automatic Transfer Switch Photovoltaic Solar Generator Changeover
Model Poles Overall Dimensions Mounting dimensions
W L H W1 L1
LDQ9-63A
 
3,4 290 240 135 255 220
LDQ9-100A 3,4 320 240 140 285 220
LDQ9-250A 3,4 370 240 160 335 220
LDQ9-400A 3,4 525 330 190 465 300
LDQ9-630A 3,4 650 330 190 585 300

ATS CB/Class 63A/100A/3p/4p Dual Power Automatic Transfer Switch Photovoltaic Solar Generator ChangeoverATS CB/Class 63A/100A/3p/4p Dual Power Automatic Transfer Switch Photovoltaic Solar Generator ChangeoverATS CB/Class 63A/100A/3p/4p Dual Power Automatic Transfer Switch Photovoltaic Solar Generator ChangeoverATS CB/Class 63A/100A/3p/4p Dual Power Automatic Transfer Switch Photovoltaic Solar Generator ChangeoverATS CB/Class 63A/100A/3p/4p Dual Power Automatic Transfer Switch Photovoltaic Solar Generator ChangeoverATS CB/Class 63A/100A/3p/4p Dual Power Automatic Transfer Switch Photovoltaic Solar Generator ChangeoverQ1. Can I get samples?
Yes. If you have any needs, please contact us and we will respond within 24 hours.  

Q2. Can I use other logos or designs on the products?
Yes, we provide OEM/ODM services, you can customize products with other logos and designs.

Q3. Do you have factories?
Yes, we have factories in Jiangsu and Zhejiang, welcome to visit our company.

Q4. How do you ensure quality?
We have a complete quality management system, use qualified raw materials, conduct quality inspections in different production links, regularly collect user feedback, and trace the source in time when quality problems occur, and keep records to prevent repeated errors.

Q5. How long does it take to prepare after placing an order?
Usually it takes 5~7 days, it also depends on the quantity of the order.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier